Explained: The Mumbai-Pune Expressway Missing Link and why its first monsoon closure matters | Mumbai News

5 min readUpdated: Jul 6, 2026 01:40 PM IST Barely nine weeks after Chief Minister Devendra Fadnavis inaugurated the Rs 6,695-crore Mumbai-Pune Expressway Missing Link as a permanent solution to the expressway’s worst traffic bottleneck, a monsoon-triggered landslide has partially shut the corridor, forcing traffic back onto the old Mumbai-Pune Highway it was built to…

Read More

New link may remain off-limit for heavy vehicles even after six months | Pune News

Inaugurated on May 1, the 13.3km corridor has been opened exclusively to passenger vehicles and buses Pune: The Mumbai-Pune Expressway’s ‘Missing Link’ corridor is unlikely to be opened to heavy vehicles even after the planned six-month review. The Maharashtra State Road Development Corporation (MSRDC) has indicated that the current traffic arrangement was functioning effectively and…

Read More
https://www.effectivecpmnetwork.com/gujmt9nwx?key=845a92ed1eff1cc876ef2ad787b670bb