Bengaluru Metro: Blue line trial run in Oct; Aug 15 deadline for Pink line elevated stretch operations | Bengaluru News
The 19-km Metro stretch from KR Pura to Silk Board along ORR has reached an advanced stage of construction, though work continues to lag in Marathahalli, Iblur and Silk Board Bengaluru: Long-awaited Blue Line — a 19-km Metro stretch from KR Pura to Silk Board along Outer Ring Road — is set to enter the…
