Bengaluru road users back asphalt over concrete for Rs 450 crore Outer Ring Road revamp | Bengaluru News

Public consultation held for revamp of 17km stretch of ORR from Silk Board to KR Pura Bengaluru: Should Bengaluru’s most congested corridor be rebuilt with stone mastic asphalt (SMA) or concrete? That question dominated a public consultation on the proposed Rs 450-crore redevelopment of the 17.1km Outer Ring Road (ORR) stretch between Silk Board and…

Read More

Speed-Up Education Hub and other infra works in Kodangal constituency | Hyderabad News

Speed-Up Education Hub and other infra works in Kodangal constituency Hyderabad: Telangana chief minister A Revanth Reddy on Tuesday conducted an extensive inspection of the ongoing works at the Young India Integrated Residential School and the Education Hub at Hakimpet in the Kodangal assembly constituency. He expressed serious displeasure over the slow pace of construction…

Read More
https://www.effectivecpmnetwork.com/gujmt9nwx?key=845a92ed1eff1cc876ef2ad787b670bb